Who this is for

Small and medium-sized pharmaceutical manufacturers that supply the Indian market and have to meet Schedule M, the Good Manufacturing Practices schedule under the Drugs and Cosmetics Rules. The revised Schedule M raised the baseline for a documented pharmaceutical quality system and brought expectations closer to WHO GMP, which is a larger step for a smaller site than for a large one already running a mature system.

The common position is not that a site is unsafe or badly run. It is that the documentation, the quality system and the records have not kept pace with what an inspector now expects to see, and nobody has looked at the whole picture against the current requirement in one pass.

What Schedule M covers

In broad terms: premises and facility design, environmental and contamination control, plant and equipment, a documented pharmaceutical quality system, personnel and training, and the records that evidence all of it. The failures that stall a site are rarely a single missing machine. They are gaps between what the site does and what its documentation can show it does.

The readiness sprint

A fixed-scope engagement with a defined start and end, so a manufacturer knows what it is getting and what it will cost in time before it begins. Three parts, run in order.

1. Documentation review

We review the quality system, SOPs, batch records and site documentation against the current Schedule M requirements, so the starting point is measured rather than assumed.

2. Gap assessment

Every gap is listed and ranked by how likely it is to be raised at inspection, so remediation effort goes to what matters first rather than being spread evenly across things that do not.

3. Inspection preparation

We help prepare the site and its records for a state licensing authority visit, so the documentation supports what the site actually does and the walkthrough holds together.

What you get, and what you do not

Where the sprint ends and the authority begins
  1. 1 Documentation review Quality system, SOPs, batch records and site documentation against current Schedule M.
  2. 2 Gap assessment Every gap listed and ranked by how likely it is to be raised at inspection.
  3. 3 Inspection preparation The site and its records prepared so the documentation supports what the site actually does.
  4. 4 Inspection and licensing Assessed by the state licensing authority and CDSCO. Not a consultant, and not us.
Steps 1 to 3 are the fixed-scope sprint. Step 4 belongs to the authority, which is why the output is a remediation plan and not a certificate.

A prioritised remediation plan

A clear, ranked list of what to fix and in what order, written so the people who have to act on it can act on it. The point is a site that is ready, not a report that sits in a drawer.

Not a certificate

Schedule M compliance is assessed and licensing is granted by the state licensing authorities and CDSCO, not by a consultant. We provide an independent readiness view and a remediation plan, not a badge, and we are clear about that.

Frequently asked questions

What is Schedule M?

Schedule M is the schedule to the Drugs and Cosmetics Rules that sets out the Good Manufacturing Practices and requirements for premises, plant and equipment for pharmaceutical products in India. It defines what a manufacturing site has to have in place, from facility design and environmental control to a documented pharmaceutical quality system, to be allowed to manufacture for the Indian market.

Who does Schedule M apply to?

It applies to manufacturers of drugs for human use that supply the Indian market, including small and medium-sized manufacturers. The revised Schedule M raised the baseline for a documented quality system and closer alignment with WHO GMP expectations, which is a larger step for a smaller site than for a large one already running a mature quality system.

What does a Schedule M readiness sprint involve?

A fixed-scope engagement with three parts: a documentation and quality-system review against the current Schedule M requirements, a gap assessment that lists what is missing or out of date with each gap ranked by how likely it is to be raised, and inspection preparation so the site and its records are ready for a state licensing authority visit. The output is a clear remediation list, not a certificate.

Do you issue a Schedule M certificate?

No. Compliance is assessed and licensing is granted by the state licensing authorities and CDSCO, not by a consultant. What we provide is an independent readiness view and a remediation plan so that when the inspection happens, the site is prepared and the documentation supports it.

How is this different from your CDSCO work?

CDSCO approvals are about getting a product approved to be sold. Schedule M readiness is about the manufacturing site itself being allowed to make it. The two often run together for a manufacturer, which is why the quality and manufacturing picture and the product dossier are best kept consistent with each other.

Ready for a Schedule M inspection?

Tell us about your site and where you are with Schedule M. We will tell you what a readiness sprint would cover and what the realistic gaps are likely to be.

Talk to our regulatory team